CPZ consultation turned to shambles


The long awaited Controlled Parking Zone (CPZ) consultation with residents south of Essex Road turned into a shambles when the Council’s contractor failed to deliver consultation documents to many roads. The Council resorted to posting notices on lampposts and had to deliver leaflets themselves. As some residents did not receive their documents in time the Focus Team got assurances that the consultation period would be extended. Now residents are waiting for the results of the consultation as there are still major parking problems in their roads.


Share this post on social media:

Sign in with Facebook, Twitter or Email.